U-Power Group CFP Systematic approach Policy 2025_Rev.1
CFP (kg CO₂e/UF)
10.5
Declared/functional unit
1 pair of shoes size 42, including packaging.
System boundaries
From cradle to grave
Excluded phases
Transportation of the product from the consumer, manufacturing of production equipment, buildings and other capital goods; staff travels to and from work; waste and scrap of raw materials generated during the production phase; staff business trips
Production plants included
Via Borgomanero, 1 - 28040 Paruzzaro (NO)
Via Borgomanero, 50 - 28040 Paruzzaro (NO)
Stabilimento di Menzel Bourguiba Bizerte - Tunisia
Stabilimento Jallatte S.a.s. St. Hippolyte-du-Fort - Francia